Skip to content
నిపుణ్ న్యూస్

Orvakal: Consultations Held on Greenko Project Expansion

A. Mallikarjuna

District reporter · Kurnool Urban

· 1 min read

Share
Read in Telugu →
NIPUN NEWS

Public hearing at Pinnapuram to increase capacity from 1,200 to 1,680 MW

• Capacity expansion from 1,200 to 1,680 MW

• Construction of a bund for the lower reservoir

• Study conducted in 10 villages within a 30 km radius – Collector A. Siri

Orvakal: Consultations Held on Greenko Project Expansion

• Public hearing mandatory as per EIA norms

• Support from Brahmanapalli, Gummitanthanda, and Kaluva villages

Orvakal, Nipun News: An environmental public hearing was conducted on Thursday at the project site regarding the proposal to expand the capacity of the Greenko Integrated Renewable Energy Project at Pinnapuram in the mandal from 1,200 MW to 1,680 MW. Participating in the program, District Collector Dr. A. Siri explained that this target would be achieved by constructing a bund for the lower reservoir and increasing turbine capacity. She stated that as part of the Environmental Impact Assessment, studies were conducted on air quality as well as surface and groundwater quality. The Collector revealed that a survey on environmental conditions was undertaken across 10 villages within a 30 km radius around the project.

Orvakal: Consultations Held on Greenko Project Expansion

"As per the Environmental Impact Assessment (EIA) Notification-2006, a public hearing is mandatory for project expansion" – Collector A. Siri

Clarity on Objections and Suggestions..

The Collector said that opinions, suggestions, and objections from local people would be collected and considered during the environmental clearance process. She requested residents of surrounding villages to state their views clearly. She noted that renewable energy projects contribute to environmental protection and future power needs, adding that clean energy is generated through solar, wind, and pumped storage power projects.

Development Works Under CSR..

The Collector stated that under Corporate Social Responsibility (CSR), Greenko has undertaken works such as RO plants, construction of culverts, skill development centers, training programs, medical camps, and construction of community halls. Residents of Brahmanapalli, Gummitanthanda, and Kaluva villages declared their support for the project expansion. Locals expressed hope that along with an increase in land values, employment opportunities, roads, drinking water, and education and healthcare facilities are improving.

ఆధారం: A. Mallikarjuna

Written with AI assistance from our reporter’s notes, then checked and published by an editor.

📲 More news every day — download the Nipun News app

Related stories